last updated 11/13/2004
| downstairs - Lazaro | arturo | lazaro | fischer | terry | best | artlaz | |
| shower wall - beams - relo 3 doors | 450 | 350 | no bid | no bid | 350 | laz | |
| sheetrock repair | 300 | 800 | 300 | art | |||
| painting inside | 2500 | 1400 | 1400 | laz | |||
| floors including sand stain varathan | 600 | 800 | 600 | art | |||
| trim - doors, sills, thresholds, etc | 2500 | 900 | 900 | laz | |||
| total | 6350 | 4250 | 3550 | 3300 | |||
| upstairs - Arturo | |||||||
| support stairs half wall bath floors | 400 | 400 | 400 | art | |||
| sheetrock repair | 200 | 800 | 200 | art | |||
| painting inside | 1000 | 1600 | 1000 | art | |||
| floors including sand stain varathan | 600 | 500 | 500 | laz | |||
| trim - doors, sills, thresholds, etc | 1000 | 1400 | 1000 | art | |||
| 3200 | 4700 | 3100 | 2700 | ||||
| 6000 | framing trim painting floors | 6000 | |||||
| 1800 | electric - Carlos Benitez 636-9515 | ||||||
| 6700 | plumbing | ||||||
| 7000 | cabinets | ||||||
| 4400 | hvac | ||||||
| 500 | paint foundation | ||||||
| 1000 | roof over back of cottage | ||||||
| 200 | window trim | ||||||
| 28000 |
Materials List